1000+ Gallon | Heavy Duty Construction

1 HP Raiden Plus Top Entry Plate Mount Mixer

1 HP Raiden Plus Top Entry Plate Mount Mixer
1000+ Gallon | Heavy Duty Construction

1 HP Raiden Plus Top Entry Plate Mount Mixer

Regular price $7,627.00
/
Lead Time: 20 Business Days
The Raiden Plus top-entry mixer is our heaviest duty standard mixer, designed for high volume applications. All Raiden Plus mixers offer an increased amount of torque for added mixing capabilities.
Part Number: RDNPLUS010P-80

Our top of the line Raiden Plus top-entry mixer offers extreme durability and increased mixing power from most other agitators. Designed for applications over 1,000 gallons and a wide range of viscosities, the Raiden Series provides a low maintenance and long lasting mixer solution to your process.

Features of the Raiden Plus mixer:

  • 1 horsepower electric motor
  • IP55 rated enclosures for protection against water spray and dust ingress
  • Motors rated and badged for 230/460V, 3 Phase 60Hz or 200/400V, 3 Phase 50Hz operation
  • Helical gearbox for high torque in challenging applications
  • Wetted materials constructed of 316 or 304 grade stainless steel for corrosion and abrasion resistance
  • Easily and securely attaches with a 12" x 12" standard plate configuration
  • Customizable mixing shaft length options available
  • Two appropriately sized hydrofoil impellers matched to the mixer

  • Item Number RDNPLUS010P-80
  • Enclosure type IP55
  • Gearbox ratio 24.97:1
  • Horsepower 1 HP
  • Impeller attachment Keyed with set screws
  • Impeller diameter 34 in.
  • Impeller material 316SS
  • Impeller type Hydrofoil
  • Lead time 20 Business Days
  • Motor type TEFC Electric
  • Mount Plate
  • Mount dimension 12x12x3/8
  • Number of impellers 2
  • Phase 3 Ph.
  • Rpm 70
  • Shaft diameter 1.5 in.
  • Shaft length 80 in.
  • Shaft material 316SS
  • Voltage 230/460V
  • Weight 235 lbs.
What shipping methods do you offer?

UPS Package, FedEx Package, FedEx Freight

What are your payment options?

Credit Card and Pay Pal

Where are you shipping from?

All products are shipped from our plant in Jeffersonville, Indiana.

What time zone are you in?

Eastern Standard Time (NY)

How do I purchase with a PO?

Contact our sales team at sales@mxdprocess.com

What does lead time mean?

Lead time is the average number of business days until the product ships, it does not include shipping days.

Recently viewed