1000+ Gallon | High Flow | Heavy Duty

Electric Side Entry Mixer

Electric Side Entry Mixer
Electric Side Entry Mixer
1000+ Gallon | High Flow | Heavy Duty

Electric Side Entry Mixer

Regular price $8,909.00
/
Lead Time: 30 Business Days
Side Entry mixers provide high flow in high volume applications where a top-entry mixer would be inefficient due to mixing tank dimensions. Use one or more side entry mixer for fast tank turnover.
Part Number: SEM020EP13

Side entry mixers allow for mixing high volume applications at a reduced operating cost from a traditional top-entry mixer. Utilizing a shorter mixing shaft and our unique high efficiency fluid foil imepeller, side entry tank mixers provide higher fluid flow per horsepower in high volume applications. Our side entry mixer is equipped with a tank shut-off mechanism to allow accessibility for routine maintenance and service of the mixer. This side entry mixer is equipped with a Totally Enclosed Fan Cooled (TEFC) electric motor. The motors are IP55 rated enclosures that protect against water spray and dust ingress. The wetted materials are constructed of 316 or 304 grade stainless steel for high corrosion and abrasion resistance. This mixer mounts easily and securely to a 6 inch 150# ANSI flange. Select your horsepower and product viscosity and an appropriately sized high efficiency fluid foil impeller will be matched to your mixer.

  • Item Number SEM020EP13
  • Enclosure type IP55
  • Gearbox ratio 4.51:1
  • Horsepower 2 HP
  • Impeller attachment Set screw with safety plate
  • Impeller diameter 13 in.
  • Impeller material 304SS
  • Impeller type High Efficiency Fluid Foil
  • Lead time 30 Business Days
  • Motor type TEFC Electric
  • Mount 150# ANSI Flange
  • Mount dimension 6 in.
  • Number of impellers 1
  • Phase 3 Ph.
  • Rpm 384
  • Seal Packing Seal
  • Shaft diameter 1.5 in.
  • Shaft length 24 in.
  • Shaft material 316SS
  • Voltage 230/460V
What shipping methods do you offer?

UPS Package, FedEx Package, FedEx Freight

What are your payment options?

Credit Card and Pay Pal

Where are you shipping from?

All products are shipped from our plant in Jeffersonville, Indiana.

What time zone are you in?

Eastern Standard Time (NY)

How do I purchase with a PO?

Contact our sales team at sales@mxdprocess.com

What does lead time mean?

Lead time is the average number of business days until the product ships, it does not include shipping days.

Recently viewed